Combined operation S.V. for interception of fluids compatibles
with the construction materials.
Minimum operational pressure is not required.
The materials used and the tests carried out ensure maximum
reliability and duration.
OPERATION
Combined Acting
TYPE
2/2 way NC
Technical data
Connections
G 3/8, G 1/2, G 3/4, G 1, G 1 1/4, G 1 1/2, 1/4 NPT, 3/8 NPT, 1/2 NPT, 3/4 NPT, 1 NPT, 1 1/4 NPT, 1 1/2 NPT