Combined operation S.V. for interception of fluids compatible
with the construction materials.
Minimum operational pressure is not required.
The materials used and the tests carried out ensure maximum
reliability and duration.
Technical data
Connections
1 NPT, 1 1/2 NPT, 1 1/4 NPT, 1/2 NPT, 1/4 NPT, 3/4 NPT, 3/8 NPT, G 1, G 1 1/4, G 1 1/2, G 1/4, G 1/2, G 3/4, G 3/8